PEACH / Solutions / Operations & Supply Chain

Operations
& Supply Chain

Quality must not depend on who is on shift today. A good operating system is one where a person on their third day still produces exactly the right product.

All solutions →
The problem

Which situation is your business in?

01

Quality varies between outlets

The same dish and the same recipe, but customers say one store tastes better than another.

02

High waste with no identified cause

Inventory and sales figures do not match, and no one has the data to pinpoint the leak.

03

Kitchen lacks capacity as outlets are added

Past a certain threshold, in-store prep stops working as a model.

04

Training new staff takes too long

With no standard documentation, each manager teaches differently, and when a strong person leaves, the implementation knowledge leaves with them.

Services

3 packages in this group

01

Operation System Package · SOP

Build a complete operating procedure set: service procedures, portioning, hygiene, shift opening and closing, with forms and training materials.

10–14 weeks
02

Central Kitchen & Supply Chain

Capacity planning, production line design, an internal logistics system and daily inventory control mechanisms.

16–24 weeks
03

Quality Control & Store Audit

A store scoring standard, periodic audit process and a reward and penalty mechanism tied to results.

4–6 weeks
Approach

4 phases

01

Site survey

Work real shifts at multiple outlets and record the gap between procedures on paper and reality.

02

Standardize & portion

Fix recipes, portions and standard times for each task and each dish.

03

Document & train

Turn procedures into manuals, videos and checklists new staff can use right away.

04

Audit & sustain

Run the first audit round, adjust and hand over a self-sustaining mechanism to the internal team.

Featured project

Building a central kitchen for 22 outlets

Bakery chain · 22 outlets · 2024

In-store prep caused waste of up to 9.4% and each outlet needed five kitchen staff. PEACH planned capacity against a 36-month projection, designed the production line and an internal logistics system with two runs per day.

Ingredient waste9,4%3,1%
Kitchen staff / outlet52
Quality variance±18%±4%
New staff training time21 days7 days
Next step

Book a 30-minute consultation

This is not a sales call. You describe one specific problem, and we discuss candidly whether it is the root cause and what is needed to address it.

343 Pham Ngu Lao Street, District 1, Ho Chi Minh City
tientien@peach.vn · 056 566 7686

Chat on Zalo